In accordance with the obligations set out in Section H10.12A of the SEC, from 24 July to 5 August DCC consulted on the timing and approach of testing the DR infrastructure. On 9 August 2019 DCC responded to this consultation.
In accordance with the obligations set out in Section H10.12A of the SEC, from 24 July to 5 August DCC consulted on the timing and approach of testing the DR infrastructure. On 9 August 2019 DCC responded to this consultation.