A consultation on the changes required to the Transition Migration Approach Document (TMAD) to enable the migration of the SMETS1 devices operated by Morrisons Data Services (MDS) SMETS1 Smart Metering Service Operator (SMSO).
DCC invites comments using the provided response template by Friday 6 September 2019 via consultations@smartdcc.co.uk.
Slides from the stakeholder engagement event included below.
Related documents
Appendix Al Transition And Migration Approach Document V 1 4 Clean
pdf | 1.13 mb
Smets1 Tmad V1 4 Consultation Briefing 210819 V1 2
pdf | 469.91 kb
Tmad For Moc Mds Response Template Draft
docx | 59.38 kb
Tmad V1 4 Consultation Document V1 0
pdf | 184.02 kb
Appendix Al Transition And Migration Approach Document V 1 4 Delta
pdf | 1.16 mb