On 18 December 2020, DCC published a consultation on changes to the SEC AL Transition and Migration Authorisation Document (TMAD) child document the Migration Authorisation Mechanism, with changes for all SMETS1 cohorts.
On 22 January 2021 DCC concluded on this consultation and provided the documentation to BEIS. The changes to the MAM will now be published.
Related documents
Smets1 Migration Authorisation Mechanism V21b Draft Delta V20
pdf | 642.04 kb
Smets1 Migration Authorisation V06a
xlsm | 74.93 kb
Smets1 Migration Authorisation Mechanism V30 Clean
pdf | 569.66 kb
Smets1 Dormant Meter Migration Schedule Notification V06
xlsm | 56.55 kb
Con Smets1 All Mam Conclusion
pdf | 255.2 kb