DCC responses

Here we publish our response to consultations carried out by other organisations. Our responses reflect the views of Smart DCC Ltd and our Service Providers. 

Search Filters

DCC ran a consultation from 31 July to 15 August 2018 in accordance with Sections H14.31 and H14.36A of the Smart Energy Code (SEC), which proposed that the date that the DCC should start providing both Device and User System Testing and the Pending Product Combinations Tests (PPCT) Services for SMETS1 should be changed from of the 31 August 2018 to 30 November 2018. This document forms DCC's recommendation to the Secretary of State to change of date that DCC must make SMETS1 Device and User System Tests and Pending Product Combinations Tests available for SMETS1.
Type:
Version:
Published date: 20 August 2018
Effective date: N/A
The DCC Performance Measurement Methodology (DCC PMM) document details the Performance Measurement Methodology in accordance with Section H13 of the SEC. The document was subject to consultation and the consultation conclusions document and the finalised version of the DCC PMM document have now been published.
Type:
Version:
Published date: 1 June 2018
Effective date: 1 June 2018
DCC consulted in November 2017 on the proposed SEC Variation Testing Approach Document (SVTAD) for SMETS 1 Services. Following this consultation and upon stakeholder request, DCC has developed a regulatory version of the SVTAD which sets out the rights and obligations of those who provide and use SMETS1 Services. The material changes which have been made to the SVTAD are highlighted in the consultation document.
Type:
Version:
Published date: 11 April 2018
Effective date: 11 April 2018