DCC consultations archive

Search Filters

Systems Integration Testing (SIT) tests the capability of the DCC and the component parts of the DCC Systems together with the Communications Hubs to interoperate with each other and with the Registration Data Provider (RDP) Systems. The SIT Approach Document sets out DCC's approach to testing during this test stage and the manner in which this testing will be conducted. Consultation closing date 17 April 2015.
Type:
Version:
Published date: 30 March 2015
Effective date: N/A
The DCC User Interface Specification (DUIS) sets out the technical details of the DCC User Interface which is the means by which Users interact with Devices. The Message Mapping Catalogue (MMC) specifies the translation of data created by Devices in Great Britain Companion Specification (GBCS) format, into a format that is standardised and interpretable. Consultation closing date 24 April 2015.
Type:
Version:
Published date: 27 March 2015
Effective date: N/A
The SMKI and Repository Testing (SRT) Approach Document sets out the scope of SMKI and Repository Testing and the manner in which testing will be conducted. Consultation closing date 10 April 2015.
Type:
Version:
Published date: 12 March 2015
Effective date: N/A
Non-Gateway Interface Specification (NGIS) sets out the means by which Suppliers that are not yet Users may have their Certificates placed on Enrolled Smart Metering Systems following a change of Supplier event. Consultation closing date 19 March 2015.
Type:
Version:
Published date: 19 February 2015
Effective date: N/A
The Threshold Anomaly Detection Procedures (TADP) provides a mechanism to stop excessive or malicious data being processed via the DCC system and issued to devices. Consultation closing date 13 March 2015.
Type:
Version:
Published date: 13 February 2015
Effective date: N/A
The DCC Key Infrastructure (DCCKI) document set comprises the DCCKI Certificate Policy, DCCKI Registration Authority Policies and Procedures, DCCKI Interface Design Specification, DCCKI Repository Interface Design Specification, DCCKI Code of Connection, and DCCKI Repository Code of Connection. DCCKI will provide authenticity and where applicable, integrity and non-repudiation of all communications with the DSP Interfaces. Consultation closing date 30 January 2015.
Type:
Version:
Published date: 22 December 2014
Effective date: N/A
The Message Mapping Catalogue (MMC) specifies the translation of data that is created at the Device-level, by smart meters and other associated devices, into a format that is standardised and interpretable. Consultation closing date 30 January 2015.
Type:
Version:
Published date: 22 December 2014
Effective date: N/A
The Infrastructure Key Infrastructure (IKI) Certificate Policy concerns the way in which a person authenticates themselves to the Smart Metering Key Infrastructure (SMKI) portal or a system authenticates itself to the SMKI web services interface. A certificate policy is a document which states the roles and duties of different actors in respect of a public key infrastructure (PKI). Consultation closing date 9 January 2015.
Type:
Version:
Published date: 28 November 2014
Effective date: N/A
The End to End Test Approach Document, SMKI & Repository Test Approach Document and the SMKI & Repository Test Scenarios Document explain how the DCC systems operate, and how their interaction with Users and other Parties will be tested prior to live operation. Consultation closing date 9 January 2015.
Type:
Version:
Published date: 28 November 2014
Effective date: N/A